Asset Recovery

Broken Cross Open Cast Mine

Euro Demolition & Dismantling Ltd were awarded the contract to carry out the plant and equipment clearance on this old open cast mining site in November 2017. Euro Demolition & Dismantling have now carried out several projects across England, Scotland and Wales for this client. Following several site visits and liaising with the client, we […]

Oil Refinery Works, Essex

Following several months of negotiation, onsite meetings with our client, and intensive pre-qualification process Euro Demolition & Dismantling were awarded the contract to dismantle the Gas Turbine and Heat Recovery Steam Generator Unit at the oil refinery site in Essex down to slab level. Prior to the dismantling of the GTG unit and the Steam […]

Bantycock Open Cast Mine, Newark

Euro Demolition & Dismantling Ltd were given the project to demolish the old SPD building and the ablution block at the Bantycock open cast mining facility which was on a live working site. The SPD building was of a metal construction and the ablution block a brick building. All machinery items, conveyors etc had to […]

Manufacturing Facility, Germany

Euro Demolition & Dismantling Ltd were awarded a contract to strip out redundant plant, machinery, manufacturing plant within specified areas of a large Manufacturing Facility in Germany. Works included the removal of all internal pipework, tanks vessels, containers, mezzanines, and all other manufacturing equipment within the identified areas. All equipment and plant was provided by Euro Demolition and […]

Wansbrough Paper Mill, Somerset

The Wansbrough paper mill in Somerset closed in December 2015 after 265 years. Following over 12 months of discussion, due diligence and negotiation, our associated company purchased the paper mill site and contracted Euro Demolition & Dismantling Ltd to carry out the demolition works in readiness for future redevelopment of the site. The paper mill was a complex […]

Polestar Printing Facility, Sheffield

Euro Demolition & Dismantling were appointed to dismantle a number of industrial printing presses and plant as well as carry out demolition works to some of the associated buildings. The Polestar printing facility operated several industrial printing presses for major UK daily newspaper titles, producing a colossal 40,000, 72 page magazines per hour, per machine. […]

Brewery, London

Euro Demolition & Dismantling were instructed by our client to remove the assets from a large brewery site in London. The photo above shows 50% of the site, which is the area of the site we worked on. At this stage the buildings were not being demolished and therefore the utmost care had to be taken not […]

Duncanziemere Open Cast Mine, Scotland

Euro Demolition & Dismantling  successfully completed the stripping and dismantling of a 70 metre long coal conveyer bridge at a site in New Cumnock, Scotland.

The site had been redundant for over 14 months and the client had been under increasing pressure from the council and SEPA to dismantle and remove the bridge.  The Bridge spanned the Glenmuir River as well as a road, so extra cautionary measures and a robust method of removal was required to ensure the safe dismantle and removal of the bridge.

Aerospace Facility, Derby

After many months of negotiation with the client, Euro Demolition & Dismantling underwent a stringent pre-qualification process with the client's engineering team SPIE who were the client's CDM co-ordinator for the works for the chemical plant removal at their Derby aerospace facility.  The chemical line equipment was no longer required and the client wanted to […]

Cement Works, Frangey

Euro Demolition & Dismantling Ltd were instructed by one of the the world's largest cement producer, to decommission and dismantle an entire 216 acre cement works site, located just 22km east of Chablis, in the Burgundy region of France. In phase one we decommissioned several parts of the plant then we were subsequently awarded the phase […]